Bathroom… Done!

Just in time for our planned moving in date, and after many late nights the first bathroom was finally completed & declared ready for use.

Sink/Loo units (minus seat & a post-installation cleanup)

Installed shower head & screen

Shower!

What isn’t pictured here is the plumbing installation needed in the loft – working in conjunction with the new hot water system we upgraded the cold water supply; cleaned out & re-plumbed the cold storage tanks & added a 2-bar negative head shower pump in the loft to supply the shower along with an up & over dedicated feed from the hot water cylinder using the air-free take-off on the specialised flange fitted when the cylinder was replaced.

With this hurdle cleared, we’re at a point with enough done in the house to move in!

Similar Posts

Leave a Reply