After several weeks’ wait, another milestone’s arrived – what felt like a pallet’s worth of laminate flooring for the lounge, hall, entrance porch & old kitchen has finally turned up from B&Q..
The new pre-lagged cylinder was first fitted with all the various bits and pieces needed to connect it up – new hard-water suitable immersion heater went in first: Followed by a specialised Salamander S-Flange for the domestic hot water take off & dedicated air-free supply to a pumped power shower, yet to be purchased or…
Great progress is also being made in the new kitchen. The builders have demolished the old dividing wall, ripped down the ceilings, stripped off old plaster, sorted out the electrics & have nearly finished plasterboarding / drywalling the room ready to tape & skim the new walls.
The day has finally arrived…. Our new kitchen is in the building – in bits though! The new room is nearly ready to have the bits fitted and with luck, will acquire floor tiles & necessary plumbing tomorrow with the kitchen going in next week. All building work has now been completed; walls & ceiling…
… Without a set of drains ! The old utility room was equipped with a water supply but unfortunately no drainage. As a result, during a rare break in the surprisingly snowy weather the focus switched to some outside works to lift most of the patio paving slabs & re-route underground drainage to accommodate the…
Update: If you’re looking for a C Plan or similar central heating wiring diagram, click here! One of things we noted when we first moved in was that it was impossible to run the central heating system to just heat some hot water without also heating all the radiators. Not too bad in the winter,…
Just a quick update to say that a busy week is coming up… Progress today includes lots of ground work to prepare the way – getting a couple of rooms nearly ready to finish off when a floor sander arrives on monday! Window sills have been painted & coving “installed” in both main bedrooms. Tomorrows…