With the onset of 2010, our builders have arrived in style on the first working day of the year.

We’ve engaged a brilliant local firm called Upgrade Building Solutions (UBS) to demolish the dividing wall between the old Utility & Dining rooms, make good, tile the floor and supply/fit a new kitchen.

The rooms started life as this – utility on the left, dining room on the right with a solid blockwork wall in the middle.

Aside from the dubious picture, UBS arrived en-mass on day one – filling the drive & most of the road with their vans.

Much controlled chaos followed their arrival with the wall coming down along with the original plasterboard ceilings in the space of a day – resulting in the slightly odd sight of daylight through the upstairs floorboards!!!

Similar Posts

  • Bathroom build

    With the flooring prepared, joists strengthened & route prepared for the waste pipework; the first major task in the bathroom build was to install the shower tray on the required mortar base. Given the size, shape & weight of the tray this was no easy feat – and as a result, not many photos were…

  • First challenge of 2010!!

    After spending most of today using one, I’m convinced chemical paint strippers should carry more of a health warning: “do not use if currently alive” or “full-body protective clothing & breathing apparatus must be worn before opening” might do the trick! We’ve been in the process of restoring the stair case back to more of…

  • Bathroom – 7

    Kicking off by partially draining down the heating system again, the pipework was quickly checked for the new towel rail – at which point it became rapidly apparent that more work was needed. Somehow one of the concealed radiator pipes had ended up 1cm adrift from where it needed to be to line up with…

  • Kitchen progress

    Great progress is also being made in the new kitchen. The builders have demolished the old dividing wall, ripped down the ceilings, stripped off old plaster, sorted out the electrics & have nearly finished plasterboarding / drywalling the room ready to tape & skim the new walls.

  • Bathroom 8

    We’re definitely on the home straight with this room now. The ceiling’s been painted, and work’s started on fitting two essential bits of equipment – a WC and basin. In a moment which would have clearly been aided by hindsight, we opted for “built in” bathroom furniture with a back-to-the-wall WC and matching basin –…