Bathroom build 3

With the ceiling boarding complete, we started taping & jointing the boards to provide a (hopefully) smooth finish to the new ceiling.

The joins were taped with plasterboard tape and skimmed over with a thin coat of plaster.

After letting this go off for 24 hours we then attacked the ceiling with a sanding pad and lots and lots of elbow grease.

Eventually, the end result was a nearly perfectly smooth ceiling, ready for sealing & painting!

Here’s the room so far looking towards the shower…

We’ve also applied a Dunlop shower tanking/waterproofing kit to the walls immediately around the shower tray. This should help to ensure that the plasterboard is fully protected against damage from moisture by creating a waterproof rubberised top-coat from floor to nearly ceiling height on the walls most exposed to water.

Similar Posts

  • Lounge stripped

    Just a quick update: Lounge has now been completely wallpaper stripped & prepared for replastering. All looking a touch bare at the moment but that should hopefully start to change rapidly now.   Next stop is to tidy up what appears to be a patched-over serving hatch (!) and to remove a window seat/ cupboard…

  • And so it begins…

    First “real” task on the agenda (after yesterday’s clean etc) is to strip out a er, lovely built in wardrobe. Looks like it was knocked up by an over zealous chippy when the house was built – complete with a fine example of 1970’s wallpaper for good measure. Definitely has to go…. Only question is…

  • More mountains moved!

    Great progress today – starting to feel like the house is slowly coming together now. Lounge plastering is well underway; bedroom 1 has had all of the remaining mess/carpet tape removed along with the first coat of paint on the replastered walls & ceiling and the remaining paintwork in bedroom 2 completed. We’ve also made…

  • |

    House catchup – apologies for the silence, life got a whole lot busier!

    As mentioned elsewhere, this blog has recently been moved off the elderly WordPress platform to a shiny new blogging engine called Ghost. Ghost is a brilliant new way of managing your content, and one that’s simpler and faster than WordPress. Enough about the technology though. Once I’d moved the blog over, on looking through the…

  • Progress!

    Things are moving forwards nicely so far this week – and it’s only Monday! Lots of painting is being done, with vast quantities of raw plaster being covered with 1st coats of paint. While paint’s going up downstairs I’m taking advantage of a few spare floor boards that had been left in the loft to…

  • Bathroom – 7

    Kicking off by partially draining down the heating system again, the pipework was quickly checked for the new towel rail – at which point it became rapidly apparent that more work was needed. Somehow one of the concealed radiator pipes had ended up 1cm adrift from where it needed to be to line up with…