Dining room; next stop, painting….

After a tedious couple of weeks, the transformation of our old kitchen into a dining room is nearly complete.

Aside from needing to hang a couple of doors, all that’s really left to do is sealing & painting the walls & ceiling.

That’s tomorrows job, followed by the skirting & anything else wooden that needs a coat of paint..

The end is (finally) in sight!

Similar Posts

  • Bathroom – 7

    Kicking off by partially draining down the heating system again, the pipework was quickly checked for the new towel rail – at which point it became rapidly apparent that more work was needed. Somehow one of the concealed radiator pipes had ended up 1cm adrift from where it needed to be to line up with…

  • Deliveries!

    After several weeks’ wait, another milestone’s arrived – what felt like a pallet’s worth of laminate flooring for the lounge, hall, entrance porch & old kitchen has finally turned up from B&Q..

  • Bathroom build

    With the flooring prepared, joists strengthened & route prepared for the waste pipework; the first major task in the bathroom build was to install the shower tray on the required mortar base. Given the size, shape & weight of the tray this was no easy feat – and as a result, not many photos were…

Leave a Reply

Your email address will not be published. Required fields are marked *