Unplanned works; new hot water system!
ByTim
On inspecting the heating / hot water systems (DHW) when we first got the keys we’d noted that the hot water cylinder was getting a little tired, and would probably need to be replaced at some point relatively soon. What we weren’t quite expecting was to come into the house at around 3pm on a…
Bathroom build
ByTim
With the flooring prepared, joists strengthened & route prepared for the waste pipework; the first major task in the bathroom build was to install the shower tray on the required mortar base. Given the size, shape & weight of the tray this was no easy feat – and as a result, not many photos were…
Plasterwork finally done!
ByTim
Reached a bit of a milestone over the last weekend – all of the replastering we needed to do for the moment has now finally been completed. The Lounge has now been finished, along with the hall, staircase walls and upstairs landing walls! The biggest benefit of this work being finished is that it means…
Bathroom build …. 5
ByTim
Tiling’s well underway, and with all the wall tiles firmly in place we made a start on the floor. Started the tiles from the shower tray, with a view to keeping as much floor as possible covered by tiles where splashes are likely! Leaving the first couple of rows to set overnight, the next step…
Kitchen – the reveal!
ByTim
All building work’s now been completed and the kitchen is finished (bar a tiled splashback). Here’s how it was supposed to end up, according to the plans: And this is the finished result! For a look around, have a look at this “PhotoSynth” of the finished kitchen! http://photosynth.net/embed.aspx?cid=c2be9062-406b-4fc2-b870-a67425e452c3&delayLoad=true&slideShowPlaying=falsePhotos: Full credit has to go to Upgrade…